When will the snowplow arrive?

City snow and ice control operations begin whenever a response is needed to protect residents/motorists from the hazards of winter driving. Full mainline and cul-de-sac plowing operations begin at various times, depending on the start time and duration of the storm event. Routes and operations are designed to maintain access of emergency vehicles to all areas as a first priority. The plowing of high volume roadways generally occurs first, followed by residential plowing. In general, city roadways are cleared of snow within 8 to 12 hours of the end of the storm events.

Show All Answers

1. How do I report a pothole?
2. Can I deposit or store a dumpster in the street?
3. Can I rake my leaves, grass clippings, or other yard waste in the street for the City to pick-up?
4. Can I store landscape materials in the street?
5. When will the snowplow arrive?
6. How do I report mailbox damage?
7. Who do I contact to request a temporary street closure?